This site uses cookies for analytics and to improve your experience. By clicking Accept, you consent to our use of cookies. Learn more in our privacy policy.

Skip to content
uMCAD

Preferred 3D design source

Cart total: $0.00
Menu
  •  3D Mall
    • SolidWorks
    • Inventor
    • CREO
    • SketchUp
    • UG
    • AutoCAD
  •  Blog
    • Design
      • UI Design
    • Technology
      • Mechanical
      • Electrical
      • Automation
  •  Checkout
    • Order History
    • Transaction Failed
  • MathNotes
  • Easynotifyforward
  • Log In
    • Register
    • Edit User Profile

Work Order: Magazine Ejector Jamming on the Component Feed and Sorting Station

JUMI 2026-09-112026-09-19 Technology  component stack magazine, feed and sorting station, magazine ejector jam

WORK ORDER — Maintenance and Improvement Record Work order no: WO-A-2026-06    Date issued: 2026-09-11    Category: Component feeding Machine / cell: Feed and Sorting Station FS-3 upstream of the assembly line Status: Closed   …

Continue reading →

Work Order: Rotary Pallet Changer Index Angle Drift Causing Workpiece Out-of-Square

JUMI 2026-09-112026-09-19 Technology  machine tool pallet interchange, pallet changer index accuracy, rotary pallet changer

WORK ORDER — Maintenance and Improvement Record Work order no: WO-A-2026-05    Date issued: 2026-09-11    Category: Pallet changer Machine / cell: Rotary pallet changer on Machining Centre MC-4 Status: Closed    Engineer: L. Brandt…

Continue reading →

Work Order: Pallet Locating Pin Wear and Repeatability Drift on the Pallet Transfer Station

JUMI 2026-09-112026-09-19 Technology  fixture locating pin wear, pallet locating pins, pallet transfer station repeatability

WORK ORDER — Maintenance and Improvement Record Work order no: WO-A-2026-04    Date issued: 2026-09-11    Category: Pallet transfer station Machine / cell: Pallet Transfer Station PT-2 serving the machining centre cluster Status: Closed   …

Continue reading →

Work Order: Ring Light Flicker Causing Vision False Rejects at the Inspection Station

JUMI 2026-09-112026-09-19 Technology  machine vision ring light, strobe light inspection station, vision lighting flicker troubleshooting

WORK ORDER — Maintenance and Improvement Record Work order no: WO-A-2026-03    Date issued: 2026-09-11    Category: Vision station lighting Machine / cell: Inspection Station IS-1, 12-megapixel camera with a 100 mm white ring light…

Continue reading →

Work Order: Seventh Axis Linear Track Positioning Fault on the Welding Robot

JUMI 2026-09-112026-09-19 Technology  linear track positioning accuracy, robot 7th axis linear track, welding robot track alignment

WORK ORDER — Maintenance and Improvement Record Work order no: WO-A-2026-02    Date issued: 2026-09-11    Category: Robot 7th axis Machine / cell: Welding Cell WC-2, articulated robot on a 6 metre linear track Status:…

Continue reading →

Work Order: Pneumatic Fixture Clamping Force Verification on the Drill Cell

JUMI 2026-09-112026-09-19 Technology  fixture clamp force calculation, machining fixture troubleshooting, pneumatic fixture clamping force

WORK ORDER — Maintenance and Improvement Record Work order no: WO-A-2026-01    Date issued: 2026-09-11    Category: Pneumatic fixture Machine / cell: Drill Cell DC-4, vertical drilling station    Status: Closed Engineer: J. Radek (fixtures…

Continue reading →

Work Log: Hydraulic Circuit Leak Hunt on the Injection Press

JUMI 2026-09-112026-09-19 Technology  hydraulic cylinder slow movement troubleshooting, hydraulic leak detection procedure, hydraulic return filter maintenance

Work log — injection moulding shop, hydraulic leak hunt week Engineer: M. Okafor (fluid power) Project: IM-4 320 tonne injection press hydraulic station Log period: Day 01 to Day 06 Document ref: WL-2026-0911-SL10 Day 01…

Continue reading →

Work Log: Seal Selection and Groove Design on the Mixing Vessel

JUMI 2026-09-112026-09-19 Technology  mechanical seal selection guide, O-Ring Groove Design, packing gland refurbishment procedure

Work log — Process plant, seal selection and groove design week Engineer: K. Yarrow (static equipment) Project: MV-9 mixing vessel agitator shaft seal Log period: Day 01 to Day 06 Document ref: WL-2026-0911-SL09 Day 01…

Continue reading →

Work Log: Lube Interval and Oil Selection on the Press Line

JUMI 2026-09-112026-09-19 Technology  bearing lubrication audit procedure, grease selection for press machines, lubrication interval optimization

Work log — Press shop, lube interval and oil selection week Engineer: R. Suto (plant lubrication) Project: PL-4 press line, straight-side 400-tonne press and feed system Log period: Week 01 to Week 02 Document ref:…

Continue reading →

Work Log: Spindle Bearing Preload Tuning on the Glaze Pump

JUMI 2026-09-112026-09-19 Technology  bearing cage wear diagnosis, bearing preload tuning method, machine tool spindle bearing

Work log — Glaze pump project, spindle bearing preload week Engineer: M. Ibera (rotating machinery) Project: GP-15 ceramic glaze pump, 15 kW direct-drive spindle Log period: Day 01 to Day 05 Document ref: WL-2026-0911-BP07 Day…

Continue reading →

Work Log: Gear Backlash Control on the Four-Bar Indexer

JUMI 2026-09-112026-09-19 Technology  gear backlash control, gear center distance measurement, preloaded gear pair setup

Work log — Indexer project, gear backlash control week Engineer: T. Nowak (precision mechanisms) Project: FBL-4 four-bar rotary indexer, cam and gear-blended drive Log period: Day 01 to Day 06 Document ref: WL-2026-0911-BK06 Day 01…

Continue reading →

Work Log: Rotary Table Accuracy Calibration on the HMC

JUMI 2026-09-112026-09-19 Technology  4th axis indexing error correction, rotary axis pitch error compensation, rotary table accuracy calibration

Work log — Machine tool project, rotary table calibration week Engineer: H. Gallo (machine tool metrology) Project: HMC-610 machining centre, 4th axis rotary table Log period: Day 01 to Day 06 Document ref: WL-2026-0911-RT05 Day…

Continue reading →

Work Log: Vision Positioning and the Mechanical Datum Handshake on the Assembly Cell

JUMI 2026-09-112026-09-19 Technology  camera to robot calibration, hand eye calibration accuracy, vision positioning mechanical datum

Work log — Assembly cell project, vision-to-machine datum week Engineer: M. Offredi (automation integration) Project: ASC-12B smart assembly cell, camera-guided gear insert Log period: Day 01 to Day 07 Document ref: WL-2026-0911-VD04 Day 01 —…

Continue reading →

Work Log: Cylinder End Stroke Cushioning on the Pallet Stacker

JUMI 2026-09-112026-09-19 Technology  cylinder cushion needle setting, cylinder end stroke cushioning, pneumatic cylinder cushion adjust

Work log — Pallet stacker project, cylinder cushioning week Engineer: A. Benetti (pneumatics commissioning) Project: PSR-900 palletising suction stacker, 900 mm lift arm Log period: Day 01 to Day 06 Document ref: WL-2026-0911-CS03 Day 01…

Continue reading →

Work Log: Design Diary for the Worm Gear Self-Locking Lift Table

JUMI 2026-09-112026-09-19 Technology  self locking worm drive design, worm gear self locking, worm gearbox no backdrive

Work log — Lift table project, worm gear drive diary Engineer: E. Kowalski (mechanical designer) Project: LFT-1400 service lift, 1,400 kg capacity, 1.1 m travel Log period: Day 01 to Day 08 Document ref: WL-2026-0911-WG02…

Continue reading →

Posts navigation

Older posts
Newer posts
NEW

Comprehensive Conveyor Design Guide

Everything you need to know about designing efficient and reliable conveyor systems

Optimal system layout planning
Material selection guidelines
Performance optimization tips
Maintenance best practices
Get Your Guide Now
Posts You May Like
  • Weld Fatigue: How to Design a Joint That Lasts Beyond 10,000 Cycles
  • Strain Gauge Measurement: Bridge Wiring and the Numbers Behind It
  • Gear Reducer Thermal Rating: Why It Overheats at 40% Load
  • Pneumatic Tubing Sizing: Why Your Cylinder Is Slow, and How to Fix It
  • Coupling Selection: Backlash, Misalignment, and Torsional Stiffness
  • Pneumatic Leak Rate: How Much Air Are You Wasting?
  • Vacuum Gripper Sizing: Flow, Leak Rate, and the Right Ejector
  • Ball Screw Critical Speed: When Your Axis Vibrates at High RPM
  • Tolerance Stackup: Worst-Case vs RSS, and When to Use Each
  • FEA Mesh Quality: When Your Simulation Lies to You
Popular 3D Download Tags
AGV (5) Apartment Building (2) AS/RS (5) Autodesk (7) Automated Warehouse (7) Automation (8) Battery Machine (3) Belt (1) Bicycle (2) Bottle Packaging (1) Brick Machine (3) Cabinet (3) Capping Machine (2) CCD Inspection (1) Compressor (6) Compressor Equipment (1) Conveyor (32) Cutting Machine (2) Diaphragm (6) Electrical Cabinet (6) Facemask Machine (16) Factory Design (11) Fitness Equipments (3) Garage (1) Hot Melting (1) Human Model (2) Industrial Equipment (2) Inventor (7) Labeling Machine (5) Lifting Equipment (4) Mine Machine (2) Packaging Machine (19) Press Machine (3) Production Line (9) Punching Machine (6) Pusher (2) Rejector (3) Residential Building (4) Retracting Conveyor (5) RGV (6) Soldering Equipment (1) Stacker Crane (6) Tapping Machine (1) Vacuum Furnace (2) Vending Machine (4)
uMCAD © 2026   Contact us   Terms & Conditions    Privacy